EECA 2024 · In force now — Peninsular Malaysia & Labuan

Comply with the new energy law.
Cut your bill. KERO does both.

21,600 GJ/yr
Threshold ≈ 6 GWh
3 months
to appoint a manager
12 months
to audit & report
RM50,000
max fine per offence

The law now requires Malaysia's biggest energy users to track, audit and report their energy use to Suruhanjaya Tenaga. KERO does all three, and turns that same data into a lower bill.

Trusted by
AbbottFlexAeonUIA
Works with
Your TNB dataSIRIM-aligned
See it work
BUS VOLTAGE · 415 V
FREQ · 50.02 Hz
ZONE A · ACTIVE
LOAD SHED · OFF
PF · 0.84 ↓
PEAK DEMAND · 1,284 kW
MDI · 87%
THD · 4.2%
LOOP T · 12.4°C
PRESSURE · 6.2 BAR
↑ 82.3 A
↓ 41.8 A
→ 310 kPa
↑ 29.1°C
→ 2.4 m³/s
Chiller-01
Load 82%
High
Pump-14
+18.4%
Overload
HVAC-B
Zone 3
Inefficient
Boiler-03
Temp High
Alert
Compressor-07
Pressure
Maintenance
Cooling Loop
ΔT High
Overload
Energy Loss
18.7%
≈ RM 12,480 / wk
Grid Draw
1,284 kWh
Peak Demand
Daily Cost
RM 48,320
+22% vs target
Carbon Emission
12.6 tCO2
Untracked
Power Factor
0.84
Below 0.90 target
Demand Indicator
87%
Approaching limit
Operational Core
Connected Systems
Chillers
1,284 kWh
Pumps
245 kWh
HVAC
964 kWh
Compressors
532 kWh
Boilers
1,036 kWh
Solar
−742 kWh
System Overview
Live
Consumption
2,457 kWh
↓ 18.6% vs yesterday
Daily Cost
RM 36,120
↓ 25.2% vs yesterday
Chillers
Healthy
Pumps
Healthy
HVAC
Healthy
Compressors
Monitor
Boilers
Healthy
Solar
Generating
Efficiency Score
92%
Excellent
Consumption trend ↓ 18.6%
Energy Management Platform
You can't control
what you can't see.

Hidden energy waste is costing
more than you think.

Real-time Operational Control
See waste.
Stop loss.

Real-time monitoring. Smarter decisions.
Lower operational costs.

Book a Demo
Scroll

Connected to every critical system.

KERO connects with all major energy-using systems to give you complete operational visibility across your facility in real time.

The EECA clock

The EECA clock is already running.

Once your site passes 21,600 GJ a year, the law sets fixed deadlines — 3 months to appoint a Registered Energy Manager, 12 months to audit and report to Suruhanjaya Tenaga. The setup to get there takes weeks, so the earlier you start, the easier the deadline.

EECA Notice
Requirement identified
System Integration
Connect facility systems
Data Collection
Baseline operational data
Reporting
Structured for ST submission
Submission
Compliant and on time
Estimated setup
2 – 8 weeks
Check EECA readiness
Why KERO

Built for energy-intensive
operations.

Built for EECA reporting

Tracks, audits and structures the energy data Suruhanjaya Tenaga requires — the real-time monitoring and visibility your site needs to report on time.

Explore the platform →

One connected system

Bring fragmented operational systems — chillers, HVAC, pumps, electrical — into one centralised platform.

See how it connects →

Up and running in weeks

Less manual setup and faster onboarding, so your team reaches full operational visibility in weeks.

View industries →
Ready to start

See your operation
in action.

Book a live session and see how KERO handles your EECA reporting and helps cut your energy bill.

Book a Demo Check EECA readiness